Govan Graving Docks’ 118th Birthday #SaveGovanDocks

CDPI Blog

Next week on Wednesday 27th April it will be exactly 118 years since the opening of No. 3 dry dock at Govan – the large dry dock nearest to Govan Rd.

Govan Graving Docks in Glasgow, Scotland No. 3 dry dock at Govan Graving Docks

This was the last dry dock to be built at Govan and it pre-dates the former Burgh of Govan becoming part of the City of Glasgow.

Commissioned by James Deas, Chief Engineer of the Clyde Navigation Trust, this was the deepest dry dock in Britain when it opened and it could accommodate the largest ships in the world at the time. The walls are constructed from hand carved granite blocks. Anecdotally it is claimed to have been the largest dry dock in Europe (and the world) when it was built.

Length: 880ft (268.3m)
Width: 83ft (25.3m)
Depth: 26ft 6ins (8.1m)

At 417 ft (127m)  the tower at Glasgow Science Centre in the…

View original post 214 more words

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s